Modernization of a sampling system

Sampling systems typically run for decades, often continuously and under heavy loads. That was the case with our project at a port facility, where humidity, dust, and significant temperature swings add extra strain. Over time, two problems, among others, became acute: the manufacturers of the original drive technology and other components no longer existed, and replacement parts for machines and assemblies that had long been discontinued were virtually impossible to obtain. Any failure directly disrupted the plant's core process: sampling iron ore.

In such cases, building a completely new facility is rarely economically viable. Instead, what's needed is a solution that works with the existing structure and applies only targeted upgrades. This is precisely where our strength lies: we surveyed and assessed the existing plant on-site, even though some of the inventory documentation was more than 50 years old. Based on this assessment, we replaced the receiving stations of two bucket elevators and upgraded the drive units to the current state of the art. In addition, we replaced two double roller mills—used for one stage of sample preparation—with Roskopf machines of our own design. Both were integrated in such a way that they fit seamlessly into the existing steel structure and conveying system without requiring a completely new plant.

Beyond the mechanical implementation, our service portfolio also includes control and electrical engineering. We brought the plant up to current standards—not just mechanically, but also for regulatory compliance, including safety-critical switching functions and control stations.

Engineering, manufacturing, installation, and commissioning were all handled by a single provider. For the operator, this meant one short, predictable shutdown instead of repeated outages plus a single, reliable point of contact throughout the project. As a result, the plant can safely stay in operation for many more years—without the need for a new build.

A few facts about our project:

  • Maximum conveying capacity of the main plant of 5,600 t/h with 24/7 operation
  • Number of Roskopf employees involved in the project: 15—ranging from technical project management to design to the installation team
  • Approximately 24 metric tons of material in the form of steel components and machinery was installed in total—at heights of up to 24 meters